Guidance to clarify the rights and responsibilities of landowners in relation to the maintenance of watercourses on or near their lands is available at www.flooding.ie . A flood relief scheme has been implemented for Leighlinbridge AFA. Unit Commander, Kevin Jones and crew member Matt Thornton survey floodwaters in Windsor on March 09, 2022 in Sydney, Australia. An increase in Local Emergency Contacts. The user will use any data shown on these maps in an appropriate and responsible manner and in accordance with this disclaimer, guidance notes and conditions of use. Agency profile. It is assumed that existing flood defences can be extended, the required extension height and associated base width was determined. Forchoimedann Oifig na nOibreacha Poibl an ceart bhar agus/n cur i lthair aon chuid den fhaisnis a chuirtear ar fil d lnrogha fin, lena n-irtear na nta seo agus an sanadh. This layer shows the modelled extent of land that might be flooded by the sea in a very extreme flood event. The Raheny (Santry River) Flood Protection Project was initiated following major fluvial flooding in 1986, 2008, 2009 and 2011, and a first phase was constructed in 2013. The proposed measure relies on ood protection being provided by some existing embankments that were constructed to provide protection to agricultural land, and that were not constructed to the modern engineering standards that would be applied now when providing urban ood protection. The potential effects of climate change have been separately modelled and reported on. The Brosna (Westmeath, Offaly and Laois) was the first scheme, which commenced in 1947. Part IV of the Arterial Drainage Act, 1945 created a provision for embankments to be absorbed into drainage schemes. When combined these works provide protection against a 100-Year flood (1% Annual Exceedance Probability) for 18 properties. The properties in the Claddagh area, along Grattan road and Father Griffin would be provided protection by building a quay wall along the Claddagh basin and Nimmo's pier. River flooding is referred to as Fluvial flooding in the Maps and Plans. A 125m length of road would also have to be raised. The upgraded culvert would contain the flow of 1% AEP fluvial event within the Mullatee watercourse. N thugann na Coimisinir rthaocht n n thairgeann siad rthaocht go mbeidh an Suomh Grasin, n aon bhar air, ar fil i gcna n go mbeidh s neamhbhriste. Existing maintenance regime for the Feale along with a maintenance programme for the improved and existing defences. It is recommended that the viability of this method is analysed further through detailed design. The scheme includes consideration of the provision of an early flood warning system and flood barriers for individual property protection in Graiguenamanagh. Ligh an sanadh, na nta treorach agus na coinnollacha side thos go cramach le do thoil chun lirmhni mcheart ar an bhfaisnis agus na sonra at faoi iamh a sheachaint. The Lower Morrell (Straffan) Flood Relief Scheme was initiated in 2010 following major flooding in 2009. sidfidh an t-sideoir aon sonra suirbh a chuirtear i lthair ar bhealach iomchu agus freagrach agus de rir an tsanta, na nta treorach agus na gcoinnollacha side seo. These embankments were created by landowners to reclaim land from rivers or the sea, typically in the 19th century. Rivers , lakes weirs and bridges were modified to enhance conveyance, embankments were built to control the movement of flood water and various other work was carried out under Part II of the Arterial Drainage Act, 1945. Some of these schemes have involved private elements. The proposed measure for Newbridge that may be implemented after project-level assessment and planning or Exhibition and confirmation might include physical works, such as a series of hard defences (flood embankments and walls), four new or upgraded trash screens tanking two existing properties and works to improve channel conveyance including dredging 90m of the Doorfield tributary and upgrading two culverts. The hard defences have an average height of 1m and a total length of 0.3km. Professional or specialist advice should be sought before taking, or refraining from, any action on the basis of the National Indicative Fluvial Mapping or the Website content. The Scheme, which comprises construction of demountable flood defences at the underpass along with localised embankments is expected to provide protection against an estimated 100-Year flood (1% Annual Exceedance Probability) in the fluvial region and the 200-Year flood (0.5% Annual Exceedance Probability) tidal event for 37 properties. exceeded in any given year. CONDITIONS OF USE AND GUIDANCE NOTES to transpose EU Regulations and Directives such as the EIA, SEA, and Habitats Directives and the Aarhus Convention. A phase from the Malahide Road to Raheny Village is at design stage by Dublin City Council and, subject to funding, will progress to submission for planning approval. Faoi rir na dTarma agus na gCoinnollacha, t cead agat bhar n Larscili Tscach Abhann Nisinta a chipeil, a fhoilsi, a dhileadh agus a tharchur ar choinnoll go gcomhlontar na coinnollacha seo a leanas: nor cheart duit an t-bhar a mhodhn n a oirin; admhaonn t foinse an bhair trd an riteas sannta seo a leanas a ireamh: "Istigh leis seo t faisnis Oifig na nOibreacha Poibl Oifig na nOibreacha Poibl; n mr duit a chinnti nach n-sideann t an t-bhar ar bhealach a chuireann aon stdas oifigiil in il n a chuireann in il go dtacaonn Coimisinir Oibreacha Poibl na hireann leat fin n le dsid as an bhar; n mr duit a chinnti nach ndanann t daoine eile a chur am n go ndanann t mfhaisnis ar aon fhaisnis, bhar n a fhoinse n go n-sideann t an fhaisnis n an t-bhar ar bhealach at dobhlach do na Coimisinir; comhaontaonn t gan an t-bhar a sid agus mar phromhchuspir agat tirge n seirbhs irithe a fhgairt n a chur chun cinn n chun crche mdhleatha, mmhorlta, calaois n mmhacnta; yn mr duit a chinnti nach sraonn an chaoi a n-sideann t an t-bhar an reachtaocht um Chosaint Sonra de rir mar a leasfar am go ham; n mr duit a chinnti nach ndanann t ais-innealtireacht, dthioms etc ar aon chd, sonra n bhar ar an Suomh Grasin chun tacar sonra iomln n bhar eile a athchruth. The Department of Housing, Planning & Local Government (DHPLG) is researching how Community Resilience may be advanced as part of the overall review of the Framework of Major Emergency Management. These works were undertaken by Limerick City Council with funding from the OPW and are maintained under Local Authority duties. The benefit of each scheme is assessed on its merits and not all schemes can reach the level of protecting buildings (mainly dwellings) to the 1% AEP level. Project Period: 2005 2013. In addition, the flood extent mapping only takes into Equally, there may be an erosion line Earth embankments from the excavated channel will be created on the lower side of the channels to provide freeboard and prevent overtopping. Brisbane River at Brisbane City has just reached the major flood level (3.50m) on the high tide," BOM said. The average height of these embankments is 0.6m and provides protection up to the 1% AEP fluvial event and 0.5% AEP tidal event. On 11 April 2017, the Government agreed the administrative arrangements for a once-off Homeowners Voluntary Relocation Scheme for those primary residential properties that flooded during 4 December 2015 to 13 January 2016. This includes a freeboard allowance of 0.3m. Construction 1,799m of new flood defence walls, 846m of new embankments and a 2m floodgate. Tugadh na Mapa Tuile chun cinn um chomhlonadh le riachtanais Rialachn na gComhphobal Eorpach (Measn agus Bainisti Priacal Tuile) 2010 go 2015 (na "Rialachin") (ag cur feidhm le Treoir 2007/60/EC) chun creat a bhun um measn agus bainisti priacal tuile, leis an aidhm maol a dhanamh ar dhroch-thortha de dheasca tuilte maidir le slinte daoine, an comhshaol, oidhreacht chultrtha agus gnomhaocht eacnamaoch. Ligh na ritis, na nta treorach agus na coinnollacha side seo a leanas go cramach. The next step is to appoint a service provider in 2018 to review the CFRAM outputs and see if local options may be possible to reduce flood risk for approximatey 570 properties estimated to be at flood risk in a 100-Year flood (1% Annual Exceedance Probability). The Scheme, which comprises conveyance improvement, Flood Defence embankments and walls, and pumping stations is expected to provide protection against the 100-Year flood (1% Annual Exceedance Probability) for about 285 properties from the River Bride. This layer shows the modelled extent of land that might be directly flooded by rainfall in a moderate rainfall event. These works would complement the existing flood scheme already completed in Mornington. Layer Information or associated variations in erosion rates. These hard defences would protect to the 1% AEP flood event with an average height of 0.8m and a total length of 0.6km. The data is added by councils or other authorised groups, allowing the information to be shared by government agencies and other stakeholders. The proposed measure consists of embankments and walls which would protect properties to both the 0.5% AEP coastal events and 1% fluvial events. They are also commonly referred to in terms of a return period (e.g. This data shows the modelled extent of land that might be flooded by rivers (fluvial flooding) during a theoretical or design flood event with an estimated probability of occurrence, rather than information for actual floods that have occurred in the past. This data shows the extent of land that might be flooded by the sea (coastal flooding) during a theoretical or design flood event with an estimated probability of occurrence, rather than information for actual floods that have occurred in the past. Layer Information Larger culvert box to be provided. These Hard Defences would protect to the 1% AEP flood event with an average height of 1.66m and a total length of 687m. Ceadatear rochtain ar an Suomh Grasin ar bhonn sealadach. residential properties and 9 no non-residential properties at risk in Milltown from the 1% AEP event. It is currently at the Outline Design and Exhibition stage, and is expected to go to construction in 2018. The Scheme comprises flood defence walls and embankments, channel conveyance improvements, a flood bypass channel, and watercourse diversions and provides protection against a 1% AEP (100 year) fluvial event from the Mulkear River and tributaries for 70 properties. The OPW is required to maintain drainage schemes under sections 37 and 38 of the Arterial Drainage Act, 1945. The Dodder CFRAM Study included an assessment of the Little Dargle Stream. The AFAs were the focus of the CFRAM Studies. Floodgates would also be required at a number of locations along the wall to maintain access to the port. A detailed geotechnical structural and stability assessment of the existing embankments was not undertaken as part of the CFRAM study, but should be undertaken as part of the project-level assessment in progressing this measure. It is currently at the Detailed Design stage, and is expected to go to construction in 2018. The Embankments layer identifies the embankments that form part of Land Commission Embankments. The Irish Coastal Protection Strategy Study (ICPSS) flood hazard mapping is for strategic purposes, The vast majority of the Funding was provided by the Office of Public Works for this 20m scheme in three different counties. Phase 2 involves providing flood protection at the 700m section of sea walI north of the promenade to Sean Moore Park. This layer shows the modelled extent of land that might be flooded by the sea in a moderate flood event. defence works potentially protecting the coastal floodplain are not taken into account. The Scheme comprises flood defence walls and embankments along the Brosna River and provides protection against a 1% AEP (100 year) fluvial event from the Brosna River for 20 properties. Existing arterial drainage maintenance scheme will need to be maintained as part of this option. The Duleek Flood Relief scheme was initiated in 1995 and was constructed from 1997 to 1998. The user agrees that the Office of Public Works has the absolute right to reprocess, revise, add to, or remove any of the information shown on these maps at any time, and that this will in no way render them, the State or its servants or agents liable for any damage or cost incurred as a result of such acts. The scheme is scheduled to move to Exhibition stage in Q2 2018, and when completed is expected to provide protection against a 100-Year flood (1% Annual Exceedance Probability) for 116 properties against flooding from the Deel River. Present Day Scenario data was generated using methodologies based on historic flood data, without taking account of potential changes due to climate change. The Scheme, that comprises widening and deepening of the river channel, the construction of walls, embankments and culverts, underpinning of Bray Bridge, river regrading, soil nailing and erosion protection, provides protection against a 100-Year flood (1% Annual Exceedance Probability) for fluvial flooding and a 200-Year flood (0.5% Annual Exceedance Probability) against tidal flooding for 658 properties. This scheme was undertaken by the OPW and is maintained as part of current duties. N dhanann na Coimisinir barntais, uirll n gealltanais ar bith maidir le hbhar sumh grasin ar bith eile (ar a n-irtear suomh grasin ar bith faoi inireacht n arna oibri ag na Coimisinir n thar a gceann) a ndanfar tagairt d n gur fidir a rochtain tr hipearnasc taobh istigh den Suomh Grasin. To create a report zoom and click on a location of intrest - a symbol will The scheme comprises flood defence embankments and provides protection against a 1% AEP (100 year) fluvial event from the Owenagarney River for 16 properties. This represents the probability of an event of this, or greater, severity occurring in any given year. The northern phase was constructed between 2009 and 2010. The proposed measure would include the construction of an embankment measuring 415m long and 1.2m average height to store / attenuate flood water in larger events and an associated controlled outfall to prevent overland flooding of properties downstream (including the Woodlands Estate and the nursing home) when flow exceeds the existing culvert capacity. In the 0.5% coastal AEP design event the high tide in the Shannon estuary will exceed the water level inside the dock and overtop the existing gates. The Bandon River (Dunmanway) Drainage Scheme was initiated in 1990 following major flooding in 1986, and was constructed from 2000 to 2002. This will fit into the height of the existing river walls and maintain some visual connection. Two weirs would be removed on the Nuenna River (02WEIR02 at Chainage 1227 and 03WEIR01 and Chainage 1240). The Present Day maps were generated using methodologies based on historic flood data, without taking account of potential changes due to climate change. Flood event probabilities are referred to in terms of a percentage Annual Exceedance Probability, or AEP. An allowance of -0.5mm/year for GIA was included for the southern part of the national coastline only (Dublin to Galway and south of this). The purpose of the schemes was to improve land for agriculture, by lowering water levels during the growing season to reduce waterlogging on the land beside watercourses known as callows. a multiple flood point symbol is used. The embankment would protect to the 1% AEP flood event with an estimated average height of 0.9m and a total length of 53m. comhaontaonn t nach n-sidfidh t an Suomh Grasin agus/n an Larscili Tscach Abhann Nisinta chun crocha mdhleathacha, agus go n-urramidh t gach dl agus rialachn is infheidhme. The hard defences would protect to the 1% AEP fluvial flood event and to the 0.5% AEP coastal flood event, with an average height of 1.95m and a total length of 4.3km. though at present a flood defence is protecting them. A flood risk assessment was completed and a flood relief scheme proposed for the downstream extent of the watercourse close to its confluence with the Dodder. The Present Day Scenario is also referred to as the Current Scenario. The proposed measure consist of walls and embankments with a maximum height of 2.0m along the River Bandon. Construct walls along the lower Caherweesheen watercourse. The user of these maps shall be deemed to have agreed to, and unconditionally accepted all of these statements and conditions. is not accounted for and needs to be considered separately. The Commissioners neither make nor offer a guarantee that the Website, or any content on it, will always be available or be uninterrupted. In accordance with the Guidelines on the Planning System and Flood Risk Management (DECLG/OPW, 2009), planning authorities should seek to reduce the extent of hard surfacing and paving and require the use of sustainable drainage techniques to reduce the potential impact of development on flood risk downstream. The works were primarily to restore the old Drainage District scheme and comprised making good the embankments and some improvements, such as the deepening and widening of the restrictive stretch alongside the Bunky tributary. The Hard Defences would provide design SoP with an average height of 1m and a total length of 3km. potentially protecting the coastal floodplain are not taken into account. changes due to climate change. Rivers , lakes weirs and bridges were modified to enhance conveyance, embankments were built to control the movement of flood water and various other work was carried out under Part II of the Arterial Drainage Act, 1945. the maps should not be used to assess the erosion hazard and risk associated with individual properties The Present Day maps were This is also referred to as an Annual Exceedance Probability (AEP) of 0.1%. This option involves rehabilitating (i.e. The licensed rights are limited to the reproduction and sharing (but not modification) of the licensed material for non-commercial purposes in accordance with these Terms and Conditions. A flood relief scheme for Rush was developed under the FEM-FRAMS and proposed for progression to implementation in the FEM FRMP. You agree not to use the Website in a way that may impair the performance, corrupt the content or otherwise reduce the overall functionality of the Website. A tidal flood forecasting and warning system to include high resolution forecasts for Westport Quay is to be developed. The flood alleviation works at Leighlinbridge were initiated in 2010 following flooding in 2009 which overwhelmed existing defences, and were constructed from 2011 to 2012. It was noted at the Public Consultation Day in Foynes during the Draft Flood Mapping stage that the sluice gate at this location is not currently maintained and there is silt build up, maintaining and removing the silt would help reduce flood risk. generated using methodologies based on historic flood data, without taking account of potential changes due to climate A third phase downstream of Raheny village is planned for construction thereafter again subject to funding and planning approval. The last schemes were completed in the 1990s. Layer Information It is important to note that the exact positioning of the wall would need to be determined during detailed design stage following consultation with all the relevant stakeholders, as there are a number of pipeline and other utility services within the working corridor of the proposed defence wall. Forchoimedtar gach ceart den srt sin. or point locations, or to replace a detailed local erosion hazard and risk assessment. Therefore, the maps should not be used to assess the erosion hazard and risk associated with I ngach cs, ba cheart go gcuimseodh saothair dhorthaithe tagairt do floodinfo.ie, agus don sanadh thuas, Tacs sannta molta: Istigh leis seo t Faisnis Earnla Poibl na hireann ceadnaithe faoi cheadnas Sannta Creative Commons 4.0 International (CC BY 4.0) (foinse https://www.floodinfo.ie - arna sholthar ag Oifig na nOibreacha Poibl.). By accepting the Terms and Conditions, you are entering into a legal agreement with the Commissioners to waive any legal rights on your part in respect of the content provided. Downstream lock gates on the Plassey Canal The existing downstream lock gates have been assumed to be in good condition Limerick City 58 and capable of performing a coastal flood defence function up to a level of 5.1m AoD Malin. Culvert; Upgrade the existing Kilclooney Road Bridge on the River Deerpark; Regarding of the riverbed upstream and downstream of Kilclooney Road Bridge to maximize efficiency of the upgraded structure; Public Awareness, Flood Forecasting will also be required as part of this measure; The West and East Atlas channels need to be maintained to ensure their full capacity can be utilised in a flood event. Cuirtear an Larscili Tscach Abhann Nisinta, agus an t-bhar ar an Suomh Grasin seo, ar fil chun ceanglais na Rialachn a chomhlonadh agus n comhairle iad, agus nl s beartaithe iad a bheith mar chomhairle. When required during a fluvial event and at high tidal water levels the two Pumping Stations would extract any flood water that cannot be discharged to Carlingford Harbour as normal. The Poddle Flood Protection Project was initiated as part of the CFRAM process following major fluvial flooding in 1986 and 2011. For example, with this default Required map of landuse/land cover. Tr ghlacadh leis na Tarma agus Coinnollacha, t t ag danamh comhaont dlthiil leis na Coimisinir chun aon chearta dlthila ar do thaobh a tharscaoileadh maidir leis an bhar a chuirtear ar fil. The outcomes of two Individual Property Protection (IPP) pilots currently underway will inform the Government on any feasible support it could provide to at risk properties. (both now and in the future) and the detailed design of measures to mitigate and manage any such identified coastal flood risk. full details are available at the link below. Flood event probabilities are referred to in terms of a percentage Annual Exceedance Probability, or AEP. You agree that you will not pass on any of the National Indicative Fluvial Mapping or any other content on the Website to any third party without ensuring that said party is fully aware of and accepts the Terms and Conditions. Each polygon has info about the type of flood, the data source, and the area of the flood. Measures at this level are aimed at managing or reducing flood risk in more than one community. Layer Information Flows are then handled by a surface system of roadways, paths, drainage reserves and easements. Full details are available here. The proposed measure would consist of a combination of hard defences and storage methods. Mount Shannon Road - Structural flood defences are required in this area. The OPW will work with the Environment Protection Agency, Local Authorities and other agencies during the project-level assessments of physical works and more broadly at a catchment-level to identify any measures, such as natural water retention measures (such as restoration of wetlands and woodlands), that can have benefits for Water Framework Directive, flood risk management and biodiversity objectives. Live updates, traveller information and personalised alerts for NSW roads. A flood study is a technical project that identifies flood behaviour such as depth, velocity and extent across the floodplain. The Scheme, that comprises of flood defence gates for the doorways of individual properties, reduces the risk of internal flooding from the Deel River for 76 properties. process models to improve our knowledge and understanding of the behaviour and impact of tides, wave and sediment transport at the coast and of how these may change over time and potentially increase risk for coastal communities. The proposed measure for Castleconnell that may be implemented after project-level assessment and planning or Exhibition and confirmation might include; The proposed measure for Springfield that may be implemented after project-level assessment and planning or Exhibition and confirmation might include; The proposed measure for Boyle that may be implemented after project-level assessment and planning or Exhibition and confirmation might include: The proposed measure for Carrick on Shannon that may be implemented after project-level assessment and planning or Exhibition and confirmation might include; The proposed measure for Longford that may be implemented after project-level assessment and planning or Exhibition and confirmation might include: The proposed measure for Mohill that may be implemented after project-level assessment and planning or Exhibition and confirmation might include: The proposed measure for Roscommon that may be implemented after project-level assessment and planning or Exhibition and confirmation might include; The flood risk management measures considered are based on the predicted flood risk maps which were determined using all available survey and historical data up to Summer 2012. The parapet wall on the upstream face will need able to provide a flood defence function up to the required design standard. Flooding from other reaches of river may occur, but has not been mapped, and so areas that are not shown as being within a The Skibbereen Flood Relief Scheme was initiated in 2011 following major flooding in 2009. is not accounted for and needs to be considered separately. The potential measure would protect at-risk properties against the 1% AEP Fluvial flood event by flood defences. Layer Information The proposed measure consists of a series of flood walls and embankments, along with the replacement of a footbridge on the Cullion watercourse. Layer Information in erosion and recession, beach levels/volume, foreshore features, etc. It was not possible to eliminate Uimh 279 2005 arna leas ag I.R. to inform the assessment of flood risk to individual sites or properties, the detailed assessment of flood risk to existing coastal infrastructure, the detailed evaluation